Infill building across East Hill Meridian
The short plats and townhouse rows filling in behind the East Hill Meridian arterials are tight sites with no laydown area at all. One standard unit squeezed against the East Hill Meridian property line, on gravel where the excavator will not swing into it, is usually the whole sanitation plan.
Because an East Hill Meridian infill lot may only have one narrow approach, we want to know whether the driveway will be blocked by a concrete pump on service morning. A quick call the day before saves an East Hill Meridian crew a missed clean.
Arterial and utility work on the East Hill Meridian corridors
Water main replacement and signal rebuilds along 104th Avenue Southeast and 132nd Avenue Southeast in East Hill Meridian run in short limits with traffic tight against the cones. We set one unit per East Hill Meridian work limit, inside the barrier, near where the equipment sits overnight.
Franchise utility crews pulling fiber and gas through East Hill Meridian move faster than a road job and need the unit repositioned every week or two. Telling the East Hill Meridian dispatcher where the crew will be Monday keeps the unit ahead of them rather than behind.
Lake park and school events in East Hill Meridian
Lake Meridian Park and Clark Lake Park take the bulk of the East Hill Meridian summer calendar, with swim days, concerts, fireworks crowds and tournaments running through August. An East Hill Meridian park order is a row of standard units plus an ADA accessible unit on the paved loop and handwashing near the food trucks.
School fields through East Hill Meridian host weekend tournaments where the nearest building is locked. Those East Hill Meridian bookings get a Friday drop and a Monday pull so nothing sits on the turf mid-week.
