Subdivision framing across Lea Hill
Lea Hill filled in with plats faster than the road network did, so a new street here is often three turns off an arterial with parked cars on both sides. We set the first Lea Hill unit at the rock road entrance and move it inward as framing spreads through the plat.
Plateau till under Lea Hill drains slowly and the graded lots turn greasy from October onward. Keeping a Lea Hill unit on the rock rather than a future front yard is the difference between a clean service call and a stuck truck.
Green River College and campus work on Lea Hill
The college campus is the single largest address on Lea Hill, and its building projects, parking lot overlays and grounds contracts run through the summer break. A Lea Hill campus job usually takes several standard units inside the construction fence plus a handwashing station for the concrete crews.
Because students and staff are on the Lea Hill campus much of the year, placements have to stay out of fire lanes and accessible routes. We work out the Lea Hill spot with facilities first and keep the service morning early.
Hill road and utility projects on Lea Hill
The roads that climb onto Lea Hill are steep, narrow and the only way up, so a work limit on one of them affects everybody. One unit at the flat end of a Lea Hill limit, inside the barrier, is the arrangement crews actually use.
Water main and drainage replacement along the Lea Hill streets moves slowly through till and cobble. We reposition the unit with the trench on the regular run, and during a hard freeze we reschedule a Lea Hill service rather than risk the grade.
